Lumière Skin Malaysia
Synthetic
Date range
Region
Branch
SKU
Campaign
Compare

Inventory and Replenishment

Stock position across ten branches and three warehouses, with transfers evaluated before purchases.

Comparison
Snapshot 24 Nov 2026

Stock cover

i
KLCCMid ValleyPuchongGeorgetownIpohJohor BahruMelaka CityKuantanKuchingKota KinabaluSK-005
14
16
12
11
69
9
14
7
6
7
At risk (below its own lead time)TightHealthyExcess (above 45 days)

Stock-out risk

i
SK-005Kuching, SarawakCritical
Cover 6.3 daysLead 21 days3.4 units/dayOut 30 Nov 2026
SK-005Kota Kinabalu, SabahCritical
Cover 7.0 daysLead 21 days4.1 units/dayOut 30 Nov 2026
SK-005East Malaysia Distribution CentreCritical
Cover 11.7 daysLead 21 days7.5 units/dayOut 5 Dec 2026

Excess stock

i
SK-005Central Distribution CentreMYR 228,591
Cover 97 days3,881 usable unitsSurplus above safety stock 3,676
Reallocating is cheaper than reordering.
SK-005Ipoh, PerakMYR 16,904
Cover 69 days287 usable unitsSurplus above safety stock 274
Reallocating is cheaper than reordering.

Clearing excess stock

i
MYR 16,904on shelf across 1 branch holding above 45 days of cover. This is the stock a campaign can sell.
MYR 228,591more sits at 1 distribution centre, which no promotion reaches. That clears by transfer, below.

Price is not the lever here. Every percentage discount this business has run came out gross-profit negative, and the deepest band did the least: +5.4% of revenue uplift and MYR 28,695 of gross profit lost after the discount and the campaign spend, across 11 campaigns of which 0 made money. Bundle moved +4.7% and made MYR 2,838.

MechanicCampaignsUpliftIncr. GPMade money
Percentage discount, 18% or more
run at 18%, 20%
11+5.4%−MYR 28,6950 of 11
Percentage discount, 13 to 17%
run at 15%
8+10.1%−MYR 14,6272 of 8
Percentage discount, up to 12%
run at 10%, 12%
5+9.3%−MYR 14,2212 of 5
Gift with purchase
13+4.2%−MYR 6,3276 of 13
Bundle
11+4.7%+MYR 2,8386 of 11
No depth is recommended, and none can be. The deepest discount in this history is 20%, and the demand model groups price into three bands whose deepest is “18% or more”, so it cannot distinguish 20% from 40%. A ladder recommending a deeper cut would be showing you the number measured at 20%. Medians are used throughout, so one unusual campaign cannot move a row, and every figure here is M-10 and M-11 measured against each campaign’s own matched baseline window.

Read the comparison carefully. The uplift column is a revenue response, net of any discount given, so a price cut is measured after its own concession while a bundle or a gift is not. The bundles and gifts in this history carried no price reduction at all, which is part of why they clear stock without giving up unit margin. Campaigns also differ in length, product and spend, so the gross profit column compares typical outcomes rather than like-for-like experiments.

Recommended transfers

i
TRF-2207SK-002
Ipoh, Perak → Puchong, Selangor
Cover 3.7 days against a 9-day replenishment lead time
140 units
arrives 29 Nov 2026
Proposed
TRF-2208SK-002
Ipoh, Perak → KLCC, Kuala Lumpur
Cover 3.9 days against a 9-day replenishment lead time
140 units
arrives 29 Nov 2026
Proposed
TRF-2209SK-002
Ipoh, Perak → Mid Valley, Kuala Lumpur
Cover 6.2 days against a 9-day replenishment lead time
140 units
arrives 29 Nov 2026
Proposed
TRF-2210SK-005
Ipoh, Perak → Kuching, Sarawak
Cover 6.3 days against a 21-day replenishment lead time
73 units
arrives 2 Dec 2026
Proposed
TRF-2211SK-005
Central Distribution Centre → Kuching, Sarawak
Excess at Central Distribution Centre: 97 days of cover, MYR 228,591 tied up. Reallocating is cheaper than reordering.
97 units
arrives 28 Nov 2026
Proposed
TRF-2212SK-005
Central Distribution Centre → Kuantan, Pahang
Excess at Central Distribution Centre: 97 days of cover, MYR 228,591 tied up. Reallocating is cheaper than reordering.
43 units
arrives 28 Nov 2026
Proposed
TRF-2213SK-005
Ipoh, Perak → Kuching, Sarawak
Excess at Ipoh, Perak: 69 days of cover, MYR 16,904 tied up. Reallocating is cheaper than reordering.
97 units
arrives 2 Dec 2026
Proposed
TRF-2214SK-005
Ipoh, Perak → Kuantan, Pahang
Excess at Ipoh, Perak: 69 days of cover, MYR 16,904 tied up. Reallocating is cheaper than reordering.
43 units
arrives 2 Dec 2026
Proposed
773 units can be moved rather than bought. The residual 791 units is what the purchase draft is for.

Inbound purchase orders

i
PO-4462SK-002Central Distribution Centre960 unitsarrives 27 Nov 2026Confirmed
PO-4465SK-001Central Distribution Centre1,440 unitsarrives 30 Nov 2026Confirmed
PO-4468SK-004Southern Distribution Centre720 unitsarrives 3 Dec 2026Confirmed
PO-4470SK-002East Malaysia Distribution Centre480 unitsarrives 6 Dec 2026Confirmed